Criteria:

Commissioning of building automation system is divided into two stages, simulation commissioning and system joint commissioning. Monomer debugging should be done after the installation of building automation system while the later needs to be installed under the following conditions, including completions of technical equipment and pipeline installation, facility machine room and pump room cleaned and closed that reaching the indoor sanitary condition. Building automation system joint debugging is conducted after every relevant facility of the system has been installed and debugged as well as operated normally. In addition, the control loop of every facility needs to be provided for control points, state points and interfaces of building automation system, with cooperation of Professionals of each technical facility.

Service Contents:
(1)Monomer Primary element Testing.
(2)DDC Monomer Setting and Debugging.
(3)System Network Establishment.
(4)Each System Simulation Debugging.
(5)System Joint Debugging of Public Area Illumination, Aviation Obstruction Beacon and Floodlighting.
(6)Drainage System Joint Debugging.
(7)Cold Water System Joint Debugging.
(8)Elevator System Joint Debugging.
Outcome:
Combination  Performance Inspection Report of System Joint Debugging.

 